Computer Failures
Year
2000 problem or Millennium bug:
This problem was caused because of lack from
technology in that specific moment. The people that made the plans about this
computers creation and their system organization don´t think about this
important topic and that the people´s necessity to be changed.
This was the situation: The computer assumes the
first two digits are 1 and 9. To the computer, 1999 is just 99. That means the
computer will interpret 00 not as 2000 but as 1900, throwing the date
calculation off by 100 years. And to fix the problem, every computer system's
software must be checked and tested. Multiply this by the millions of computers
around the world and the hundreds of billions of lines of computer code, and
you can see how immense the project is.
The problem was about the software characteristics
and that is very limited in this and too many other aspects. The estimated
coast was about 3.6 trillion dollars; that was exaggerated, but it makes sense
because we are talking about millions of consumers.
Denver
Airport Baggage System:
It was the effect from a bad projection from the
system, the engineer’s don´t analyze the situation enough and how external
factors in the airport can affect the new technology.
The situation: At the end of the first day from
working, the system that was finally implemented was a shadow of what was
originally planned. Rather than
integrating all three concourses into a single system, the system supported
outbound flights on a single concourse only.
All other baggage was handled by a manual tug and trolley system that
was hurriedly built when it became clear the automated system would never meet
its goals.
Talking about the coast from this failure, the
quantity is almost 1million dollars that was invested in the month from system-test
period. Also the materials and the infrastructure used for this project were
really expensive.
The responsible from this failure were the people
that make the plan from this project. And just for trying to make easy the way
they move the baggage around the airport and make the process a little faster,
they finished losing 1 million dollars and time.
Mars
Climate Orbiter:
Focused on the upcoming landing of NASA's Mars Polar
Lander, these actions include: a newly assigned senior management leader,
freshly reviewed and augmented work plans, detailed fault tree analyses for
pending mission events, daily telecons to evaluate technical progress and plan
work yet to be done, increased availability of the Deep Space Network for
communications with the spacecraft, and independent peer review of all
operational and contingency procedures.
The board recognizes that mistakes occur on spacecraft
projects, the report said. However, sufficient processes are usually in place
on projects to catch these mistakes before they become critical to mission
success. Unfortunately for MCO, the root cause was not caught by the processes
in place in the MCO project.
The failure coast approximately 370 million dollars.
And was people´s mistake with some missing qualities from the software.
Bibliography: